Oilfield Professional Tools

The Flow Rate Dropped, the Tier Changed, and Every Inspection Clock on That FMP Moved Without Telling You

Under 43 CFR subpart 3175 each Facility Measurement Point runs four independent clocks — plate pull-and-inspect, transducer verification, meter tube, spot sampling — and every one of them is keyed to the FMP's volume tier. Change the average flow rate and the whole calendar silently shifts. A spreadsheet does not notice. This does: it derives the tier, recalculates all four due dates, and flags the FMPs whose tier just moved.

Buy Now — $19 →

One-time purchase. No subscription. No account. Works offline.

Four clocks, four tiers, two device types.
Nobody keeps that straight in their head.

🎚️

The tier does the arithmetic for you

Enter the FMP's average flow rate in Mcf per day and the § 3175.10 volume tier follows: very-low at 35 or under, low to 200, high to 1,000, very-high above that. The tier appears on the FMP card and drives every interval. Update the rate and all four due dates recalculate on the spot.

⚠️

A tier change is flagged, not buried

A well that fell from high to low just had its plate interval doubled from three months to six. One that climbed the other way just had it halved, and may already be late. The app names every FMP whose tier moved since its last entry, so the shift is a notification instead of a finding.

📅

Every clock, sorted by urgency

The headline view is one list across the whole portfolio: overdue in red, due within 30 days in amber, current in green, with a running count of overdue items and an indicative exposure figure at $1,000 per missed inspection under BLM's assessment schedule.

📄

The verification report, in one tap

Pick an FMP and a period and get the document: its identifying and primary-device data, every event in the period in full, and the plate-inspection detail § 3175.80(e) requires attached to it. Printable, exportable as CSV, plus a whole-portfolio CSV for the six-year retention.

The intervals the clocks run off.

ClockCitationVery highHighLowVery low
Orifice plate pull-and-inspect§ 3175.80(d)1 month3 months6 months12 months
Transducer verification — EGM§ 3175.102(b)1 month3 months6 months12 months
Transducer verification — mechanical recorder§ 3175.92(b)1 month2 months3 months6 months
Meter tube inspection§ 3175.80(h)-(k)2 years4 years8 yearsExempt
Spot sampling§ 3175.1101 month3 months6 months12 months
New / re-fractured plate cycle§ 3175.80(c)14 days, until an inspection passes API 14.3.2 § 4

A mechanical chart recorder verifies at double the EGM frequency, and a very-low-volume FMP is exempt from the meter tube clock — two rules that are easy to get backwards on a spreadsheet and impossible to get backwards here.

A calendar reminder is not an inspection record.

The plate inspection

43 CFR 3175.80(d) and (e) — pull the plate, and write down what you found

The routine pull-and-inspect runs at the tier frequency, and § 3175.80(e) sets out what the record must contain: the plate's orientation as found — bevel upstream or downstream — the measured orifice bore diameter, the condition of the plate, and whether it passed or failed against API 14.3.2 § 4. A plate that fails needs a replacement recorded, because the bore in the run has just changed and every volume calculated after it depends on that number.

The app captures all of it on the event, updates the FMP's bore and beta ratio when a plate is replaced, and puts the whole set in the verification report as a table.

The 14-day cycle

43 CFR 3175.80(c) — a new or re-fractured well is not on the routine clock

A new FMP, or one whose well has been recently re-fractured, inspects its plate every 14 days rather than at the routine tier interval — because that is when solids, scale and frac sand do their damage. The cycle ends when an inspection is recorded that passed API 14.3.2 § 4.

Mark the FMP as new or recently re-fractured and the plate clock switches to 14 days. Log a passing inspection and it reverts to the routine tier frequency by itself, with no calendar to rebuild.

The verification

43 CFR 3175.102(b) and 3175.92(b) — as-found and as-left, against a certified device

Transducer verification is not a tick in a box. The differential pressure, static pressure and temperature transducers are each read against a certified test device, as found and as left, and the error is what the record turns on. A mechanical chart recorder does this at double the EGM frequency.

The app takes all six readings plus the reference, computes each error in absolute terms and as a percentage, and keeps them with the event so the verification report shows the work rather than the conclusion.

The gap

The clocks live in one person's spreadsheet

Four intervals per FMP, two of them multi-year, all of them keyed to a tier that moves with production. A tab per year, a formula somebody copied down wrong in 2024, and a meter tube inspection nobody has thought about since the tube went in. Then the flow rate on three FMPs drops below 200 and every interval on them changes without a single cell updating.

This is the same calendar kept where the tier lives: one register, four clocks per FMP, recalculated the moment a rate changes, with the record and the report generated from the events themselves.

What the dashboard puts in front of you, worst first

Every clock on every FMP sits in exactly one band, so the exposure is on the first screen rather than found the week before an inspection.

  • Overdue — the due date has passed. Counted, and priced into an indicative exposure figure at $1,000 per missed inspection under BLM's assessment schedule.
  • Due within 30 days — enough notice to get a technician scheduled before it turns red.
  • Current — inspected, logged, and the next due date already written from the frequency table.
  • Tier changed — this FMP's volume tier moved since its last entry, so all four of its clocks were just recalculated. Named explicitly, because this is the failure nobody sees coming.

One card per FMP, one entry per event, one clock per requirement

The FMP

FMP name and BLM FMP number, lease or unit/CA, well or battery, measurement type, primary device, meter tube inside diameter, orifice bore, and the derived beta ratio.

The tier

Average flow rate in Mcf per day over the averaging period, the § 3175.10 tier it lands in, and a flag when that tier has changed since the last entry.

The plate inspection

Date and time, technician and company, prior event date, plate orientation, measured orifice bore, plate condition, and pass or fail against API 14.3.2 § 4 — with a replacement record when it fails.

The verification

As-found and as-left readings for the differential pressure, static pressure and temperature transducers against the certified test device, with the error computed for each.

The tube and the sample

Measured tube inside diameter and inspection result on the multi-year tube clock; method, laboratory, heating value and relative density on each spot sample.

Your data, exportable

The verification report as a printable page and as CSV, a whole-portfolio event CSV for the six-year retention Onshore Order 5 requires, and full JSON export and re-import between devices.

Built to the same shape as our other field-compliance logs, so if your crew already uses one, this one reads the same on day one.

Field-ready. Built for the meter run, not the office.

🛢️ FMP Measurement Compliance Log
🌙
DashboardFMPsLog EventEvent HistoryVerification ReportFrequenciesData
3
Overdue clocks
2
Due within 30 days
9
Current
$3,000
Indicative exposure
Volume tier changed on 1 FMP. Red Bench 8-2 Wellhead — High → Low. Every clock on it was recalculated.
Overdue
Sand Draw CDP Meter 1 — Orifice plate inspection
§ 3175.80(d) · Very high volume · every 1 month
BLM FMP-4901300123 · WYW-123456 / Sand Draw Unit
07 Aug 2026
29 days overdue
Cedar Rim 21-9 Re-frac — Orifice plate inspection
§ 3175.80(d) · Very high volume · every 14 days (§ 3175.80(c) new / re-fractured cycle)
BLM FMP-4901300902 · WYW-140377
06 Sep 2026
6 days overdue
Due within 30 days
Antelope Flat Battery 3 — Spot sample
§ 3175.110 · High volume · every 3 months
BLM FMP-4901300471 · WYW-118902
23 Sep 2026
in 11 days
Current
Red Bench 8-2 Wellhead — Transducer verification
§ 3175.92(b) · Low volume · mechanical recorder, every 3 months
BLM FMP-4901300688 · Indian lease 14-20-0203-8811
03 Dec 2026
in 82 days
Built by people who have stood at the meter run. Oil Rigs Now has served oilfield professionals since 2011. This is a record-keeping tool for operators who already know subpart 3175 and need the calendar and the paperwork to hold up.

What it does not do

It does not file anything with the BLM, does not decide which of your measurement points are FMPs, does not certify a device or approve a measurement plan, and does not replace 43 CFR subpart 3175, Onshore Order 5, API 14.3 or your own written procedure. It records what was inspected, by whom, when and what was found, keeps the four clocks from the published frequency table, and prints that record in the shape the verification report asks for. The exposure figure is indicative only, not a penalty calculation.

One payment. Yours to keep.

$19
one-time · no subscription · no account
  • Unlimited Facility Measurement Points and events
  • § 3175.10 volume tier derived from the average flow rate
  • Four independent clocks per FMP from a built-in frequency table
  • § 3175.80(c) 14-day new and re-fractured plate cycle
  • Explicit flag when an FMP's volume tier changes
  • § 3175.80(e) plate detail and as-found / as-left transducer error
  • Verification report, printable and as CSV
  • Whole-portfolio CSV for the six-year retention
  • JSON backup and restore between devices
  • Installs to your phone, works with no signal
Buy Now — $19 →

Everything stays on your device. Nothing is uploaded, no account is created, and the app keeps working when the lease road has no bars.