Oilfield Professional Tools

Your SWPPP Is on File. The Signed Inspection Log Behind It Is Not.

A stormwater plan with no dated, signed inspection record behind it is the first deficiency an NPDES compliance inspector writes up. Walk the checklist on your phone, sign the record on the spot, and carry every failed item through to a closed corrective action.

Buy Now โ€” $19 →

One-time purchase. No subscription. No account. Works offline.

Why the SWPPP Inspection Log

Built for the person who actually
walks the site

๐Ÿ“‹

The Checklist, in Walking Order

Erosion & sediment controls, outfalls & discharge points, material storage & secondary containment, spill prevention & response. Twelve items in the order you walk them, each taking Pass, Fail or N/A โ€” for routine quarterly visual assessments and post-storm-event inspections alike.

โœ๏ธ

A Signed Record, Not a Tick Sheet

Every inspection captures the inspector name, the date, a typed signature and a confirmation that the site was physically walked. No Fail saves without a written note, so the record you print is the record you can stand behind.

๐Ÿ”ง

Every Fail Followed to Closure

A failed item becomes an open corrective action with severity, responsible party and a target completion date (default 45 days, editable). Closing requires a note. The dashboard lists what is still open and overdue across every site.

๐Ÿ“†

The Gaps, Before Someone Else Finds Them

Next routine inspection due date and colour-coded overdue flags per site. Then the part that matters: exactly which of the last 36 months have no inspection on file, so you can see your retention window the way an inspector will.

The record is the requirement

Under a Clean Water Act ยง402 NPDES Multi-Sector General Permit (Sector O/AD) or the state CGP-equivalent your operation runs under, a written SWPPP alone is not enough: permits require routine inspections, post-storm-event inspections after a qualifying precipitation event, documented corrective actions with a completion deadline, and retained inspection records โ€” commonly three years โ€” available for regulator review. Clean Water Act penalties are assessed per day and per violation and adjusted annually for inflation. The whole remedy is a dated, signed log.

Field-ready. Built for the site, not the office.

๐Ÿ›ข๏ธ SWPPP Inspection Log
๐ŸŒ™
Kestrel 14-3H Tank Battery
TXR050000 ยท Pad 30291, Reeves, TX
Out of time
Next routine inspection
24 Jul 2026
Overdue 7d
Interval
Every 3 mo
Quarterly
5 of the last 36 months have no inspection on file. Retained record starts 14 Sep 2023.
Most recent gaps: Feb 2026, Mar 2026, Jul 2026
Outfalls and discharge points clear of sheen, floating solids or discoloration
Raised 24 Jun 2026 ยท 37d old ยท Significant
Overdue
Finding
Sheen observed at Outfall 001 following rain event; source traced to secondary containment overflow.

From Oil Rigs Now โ€” trusted by oilfield professionals since 2011.
We build practical tools for the people who work in the field, not the office. No subscriptions. No data collection. Everything stays on your device.

Pricing

One price. Yours forever.

$19
One-time purchase ยท Instant access ยท No subscription
Buy Now โ€” $19 →

No refunds. All sales are final. Instant access on purchase.

This is a recordkeeping aid, not a substitute for a site-specific SWPPP or a state-issued NPDES/CGP permit, and it does not file anything with the EPA, a state agency or a CUPA. Inspection scope, cadence and corrective-action timeframes are set by your NPDES Multi-Sector General Permit or state CGP-equivalent authorization and your own written SWPPP. Verify all scope, intervals and applicability against your permit and plan.